Adige cable stayed bridge

Adige cable stayed bridge

Adige cable stayed bridge

Full scale span 580m, deck width 30m.

Deck Section Model (1:30 scale) Wind Tunnel Tests. Steady aerodynamic coefficients, flutter derivatives measures. Assessment of the bridge stability with numerical modal approach and validation through elastically suspended section mode tests. Vortex shedding excitation study. Aeroelastic Tower study in boundary layer flow.

Plus

Year of the study: 2005

Client: GIRBA

Location: Piacenza d’Adige (Italy), motorway “Valdastico sud”

Area: Commercial project