Talavera cable stayed bridge

Talavera cable stayed bridge

Talavera cable stayed bridge

312m span Cable Stayed Full Bridge Aeroelastic Model (1:64 scale) Wind Tunnel Tests. Design and construction of large scale cable stayed full bridge aeroelastic model.

Wind Tunnel tests accounting for final configuration and different erection stages configurations. Section model tests data supplied by La Coruña University Laboratory.

Plus

Year of the study: 2009

Client: SACYR

Model & scale: Full aeroelastic model 1:64 (Full scale: Deck width 36 m)

Area: Research project and Commercial project